| Complete Tree Pruning, Trimming, and Removal Services |
San Jose |
Santa Clara |
|
State-Federal |
| Adams Middle School Campus-Wide Cellular Coverage Project |
Brentwood |
Contra Costa |
|
School |
| Aromas Portable Classroom Replacement Lease-Leaseback Contract |
San Juan Bautista |
San Benito |
|
School |
| RFP for Town of Discovery Bay Community Services District - Parks, Landscape, and Recreation Master Plan |
Discovery Bay |
Contra Costa |
|
Public Works |
| Wastewater, Water & Solid Waste Systems Consulting Services (RFQ) |
Placer County |
Placer |
|
Requests / Proposals / Professional Services |
| Waterline Repair Engineering Services |
Loyalton |
Sierra |
|
Requests / Proposals / Professional Services |
| Town of Paradise Home Infill New Construction Program Request for Qualifications (RFQ) |
Paradise |
Butte |
|
Supply / Services / Maintenance Contracts |
| Construction Services for Lease-Leaseback Project Delivery Rancho Cordova Elementary School Modernization |
Folsom |
Sacramento |
|
Schools / Institutions |
| Lease-Leaseback Construction Services for Sylvan New Construction Gym |
Citrus Heights |
Sacramento |
|
Requests / Proposals / Professional Services |
| Coutolenc MacNab Fuels Reduction |
Butte County |
Butte |
|
Site Work / Non-Building |
| Scales and Balances Calibration and Maintenance |
Sacramento Area |
Amador,El Dorado,Sacramento,San Joaquin,Solano,Sut |
|
Supply / Services / Maintenance Contracts |
| Fire Station Snow Removal - Multi Year Contracts |
Placer County |
Placer |
|
Supply / Services / Maintenance Contracts |
| Highway 246 Passing Lanes - Phase 2 #2026-RFP-035 |
|
Santa Barbara |
|
PUBLIC WORKS |
| Progressive Design-Build Services for the Fifth Street Elevated Water Tank Project (RFQ) |
Davis |
Yolo |
|
Design-Build |
| Professional Services of a Qualified Architect / Architectural Firm for the Greenville County Services Rebuild Project (RFQ) |
Greenville |
Plumas |
|
Requests / Proposals / Professional Services |
| Bicycle Crossing Enhancements, Phase I |
Santa Clarita |
Los Angeles |
|
Building |
| RFQual for Construction Manager at Risk Services for Admin Building Demolition Project |
Los Angeles |
Los Angeles |
|
Building |
| Video Projector Replacement |
Santa Monica |
Los Angeles |
|
Building |
| RFP On-Call Water Resources and Engineering Consulting Services |
Glendale |
Los Angeles |
|
Building |
| BMS Upgrades – Sector Three SSEC – Southwest - Sub Bids |
Los Angeles |
Los Angeles |
|
Building |
| Pacific Avenue Corridor Improvement Project |
Long Beach |
Los Angeles |
|
Building |
| Westlake Boulevard Landscape Improvements (CI 5652) |
Thousand Oaks |
Ventura |
|
Public Works |
| City Hall Courtyard Improvements |
Camarillo |
Ventura |
|
Public Works |
| Locksmith Services |
Oxnard |
Ventura |
|
Public Works |
| Design & Environmental Services for the Manteca City Wide Safety Improvement |
Manteca |
San Joaquin |
|
Building |
| Shaw Avenue Paving from Fruit to West Avenue |
Fresno |
Fresno |
|
Engineering |
| 2025/2026 Sanitary Sewer Rehabilitation – Package C, Remove and Replace |
Bakersfield |
Kern |
|
Building |
| Product Purchase Contract for Fresno Northeast Surface Water Treatment Facility Polymer Butcher Equipment Replacement |
Fresno |
Fresno |
|
Engineering |
| Tulare Irrigation District Annex Building |
Tulare |
Tulare |
|
Building |
| Dr. Joe Waidhofer Water Treatment Plant Low Lift Pump Station Electrical Upgrades Project |
Stockton |
San Joaquin |
|
Building |
| Whitley Avenue Pedestrian Crossing Enhancement |
Corcoran |
Kings |
|
Engineering |
| IFB 10221289-Industrial Hygiene and Hazardous Material Remediation Service |
Gustine |
Merced |
|
Engineering |
| Construct Plaza Park Pedestrian Bridge |
Visalia |
Tulare |
|
Engineering |
| San Roque Water Main Replacement Project |
Santa Barbara |
Santa Barbara |
|
Regular |
| CHP Madera Area Office – Landscaping Services |
Madera |
Madera |
|
Maintenance and Repair Services |
| Dwr - Electric Vehicle Supply Equipment - Teerink Pumping Plant |
Mettler |
Kern |
|
Building |
| CFD 5 Landscape Maintenance Services |
Oxnard |
Ventura |
|
Public Works |
| Santa Paula USD: MEP Subcontractor Pre-Qualification for 2026/2027 |
Santa Paula |
Ventura |
|
Public Works |
| RFP On-Call Professional Information Technology Services |
Long Beach |
Los Angeles |
|
Building |
| Liquid Waste Removal Services |
Los Angeles |
Los Angeles |
|
Building |
| Emergency Generator Replacement Project |
Temple City |
Los Angeles |
|
Building |
| Single Family Residence Demolition Project Located at 16429 Arrow Highway |
Irwindale |
Los Angeles |
|
Building |
| Labor Compliance Consultant Services for the Arroyo High School Phase II Modernization Project |
El Monte |
Los Angeles |
|
Building |
| RFP - 2026-27 Playground Equipment Replacement, Valencia Summit Park |
Santa Clarita |
Los Angeles |
|
Building |
| RFP Sewer Master Plan Update |
Whittier |
Los Angeles |
|
Building |
| Safety Crosswalk And Ada Improvements At Marjorie Street And Passons Boulevard Project |
Pico Rivera |
Los Angeles |
|
Building |
| Constitution Park Improvements |
Bellflower |
Los Angeles |
|
Building |
| RFQual As-Needed Fence and Wall Installation, Maintenance and/or Repairs |
Los Angeles |
Los Angeles |
|
Building |
| Anderson Valley Unified School District Hangar Demolition and Electrical Relocation Project |
Boonville |
Mendocino |
|
Schools / Institutions |
| Fire and Intrusion Alarm Monitoring, Annual Fire Alarm Inspection, and As-Needed Alarm Maintenance and Repair Services for EDD Chico |
Chico |
Butte |
|
Supply / Services / Maintenance Contracts |