| Fresno Solar Project (CANCELED) |
Fresno |
Fresno |
|
Specialty |
| Request for Qualifications for City of Coalinga Urban Forest Management Plan |
Coalinga |
Fresno |
|
RFQ-Consulting Firm/Architectural |
| Traffic Signal Left Turn Phasing at Millbrook and Alluvial |
Fresno |
Fresno |
|
Engineering |
| Request for Proposals Requirement Contract for Fence and Gate Services |
Fresno |
Fresno |
|
Specialty |
| Sierra High School Modernization Project-Lease-LeaseBack |
Tollhouse |
Fresno |
|
Sub Bids |
| E-1 Streetlight Poles |
Fresno |
Fresno |
|
Specialty |
| American Union Elementary School-Music Building |
Fresno |
Fresno |
|
Building |
| Request for Qualifications for Design-Build Services for the Forge Project |
Fresno |
Fresno |
|
Building |
| Trade Service-As Needed Unit Painting Services |
Fresno |
Fresno |
|
Specialty |
| SR-99 Gateway to Downtown Revitalization Project |
Selma |
Fresno |
|
Engineering |
| Armenian Church Western Diocese-Hye Camp Staff Cabins/Duplex Cabin Tenant Improvement (Sub-Bids) |
Dunlap |
Fresno |
|
Sub Bids |
| Amador and Smoot Extension Project |
Mendota |
Fresno |
|
Engineering |
| 5th and Quince Reconstruction Project |
Mendota |
Fresno |
|
Engineering |
| Minnewawa Avenue FID Improvements |
Clovis |
Fresno |
|
Engineering |
| AHSC Pacific Apartments Transportation Related Amenities |
Coalinga |
Fresno |
|
Engineering |
| Four Lift Stations Upgrade Project |
Coalinga |
Fresno |
|
Engineering |
| Sierra Oaks Senior Center Modernization |
Tollhouse |
Fresno |
|
Building |
| Pave More Now Bid Package S-2.1 Bullard and Forkner Traffic Signal Project |
Fresno |
Fresno |
|
Specialty |
| Requirements Contract to Furnish and Install Polyethylene Water Service Replacement |
Fresno |
Fresno |
|
Engineering |
| RFP CM at Risk with Guaranteed Maximum Price Fresno Chaffee Zoo California Exhibit |
Fresno |
Fresno |
|
Building |
| J.O. Eaton Memorial Park Turf Restoration and Tree Planting |
Orange Cove |
Fresno |
|
Engineering |
| Rose Avenue and Mitchell Avenue Routes |
Selma |
Fresno |
|
Engineering |
| Camacho Park Rehabilitation Project |
Reedley |
Fresno |
|
Engineering |
| Product Purchase Contract for Fresno Northeast Surface Water Treatment Facility Polymer Butcher Equipment Replacement |
Fresno |
Fresno |
|
Engineering |
| Shaw Avenue Paving from Fruit to West Avenue |
Fresno |
Fresno |
|
Engineering |
| Fowler High School 16 Classroom Building-Sitework and Canopy Structure (Lease-LeaseBack) |
Fowler |
Fresno |
|
Sub Bids |
| Figarden Elementary School Portable Infrastructure and Site |
Fresno |
Fresno |
|
Building |
| Request for Qualifications for Professional Consultant for Church Avenue Bus Stop Improvements Design Service |
Fresno |
Fresno |
|
RFQ-Consulting Firm/Architectural |
| Tank Site B-1.0 MGAL Water Storage Tank Project |
Orange Cove |
Fresno |
|
Engineering |
| Product Purchase Contract for McKinely and Lafayette High Intensity Activated Crosswalk (HAWK) Traffic Signal Poles |
Fresno |
Fresno |
|
Engineering |
| Blackstone Shields-Dakota AHSC Improvement Hawk Equipment |
Fresno |
Fresno |
|
Engineering |
| Biola CSD Wastewater Treatment Plant Improvement-Redesign |
Biola |
Fresno |
|
Engineering |
| Job Order Contract-Mechanical Facility Service |
Fresno |
Fresno |
|
Specialty |
| Building L Project at Sanger West Education Complex-Lease-LeaseBack Agreement |
Sanger |
Fresno |
|
Building |
| Progressive Design-Build Services West Fresno Interdisciplinary Classroom and Cafe, Fresno City College |
Fresno |
Fresno |
|
Engineering |
| Progressive Design Build Services, Ratcliffe Stadium Renovation and Field House Replacement, Fresno City College |
Fresno |
Fresno |
|
Engineering |
| CUPCCAA-West Park School District |
Fresno |
Fresno |
|
Building |
| CUPCCA-Westside Elementary School District |
Five Points |
Fresno |
|
Building |
| Azzaro Senior Community |
Fresno |
Fresno |
|
Building |