| Street Sweeping Services |
Placentia |
Orange |
|
Engineering |
| 2025/26 Citywide Slurry Seal - CIP 2515 |
Hemet |
Riverside |
|
Engineering |
| Pines Park Restroom Project |
Dana Point |
Orange |
|
Engineering |
| Willow Avenue Street Improvement |
Clovis |
Fresno |
|
Engineering |
| 2026 Landfill Gas Collection and Control System Improvement at the Clovis Landfill |
Clovis |
Fresno |
|
Engineering |
| PD- Domestic Water Treatment System |
Parker Dam |
San Bernardino |
|
Engineering |
| FY25-26 Annual Pavement Preservation Project (Zone 7B) |
Yorba Linda |
Orange |
|
Engineering |
| Red Hill Avenue and Arrow Way Traffic Signalization 4800-26XX |
Tustin |
Orange |
|
Engineering |
| Construction of the Interstate 10 Corridor Freight and Express Lane Project - Contract 2B |
San Bernardino |
San Bernardino |
|
Engineering |
| Stormwater Treatment Improvements at Galleon Way and Electric Avenue |
Seal Beach |
Orange |
|
Engineering |
| Benton Crossing Road Rehabilitation Project Phase 1 |
Bridgeport |
Mono |
|
Engineering |
| Kerman FY 25/26 Streets Rehabilitation Project |
Kerman |
Fresno |
|
Engineering |
| Friant-Kern Canal/Middle Reach Capacity Correction Project Phase 1 Pump Stations |
Lindsay |
Tulare |
|
Engineering |
| Lester Water Treatment Plant Backwash Tank Rehabilitation |
Corona |
Riverside |
|
Engineering |
| Construction of the Country Hills Storm Drain |
San Juan Capistrano |
Orange |
|
Engineering |
| Peak Park Water Well - Equipping and Site Improvements |
Buena Park |
Orange |
|
Engineering |
| 2025 Arterial Rehabilitation |
Huntington Beach |
Orange |
|
Engineering |
| Zone 4 Street Overlay and Walkway Improvements |
Laguna Beach |
Orange |
|
Engineering |
| Great Park Bosque Pedestrian Bridge |
Irvine |
Orange |
|
Engineering |
| UT1097 Western Trunk Sewer Interim Diversion |
Ontario |
San Bernardino |
|
Engineering |
| Fiscal Year 2026-27 Street Rehabilitation Project |
Big Bear Lake |
San Bernardino |
|
Engineering |
| AHSC Improvement and Oleander Extension Project |
Lemoore |
Kings |
|
Engineering |
| New Site Plumbing at Goshen Elementary School |
Visalia |
Tulare |
|
Engineering |
| Ball Junior High School Paving Project |
Anaheim |
Orange |
|
Engineering |
| On-Call Concrete Construction |
Garden Grove |
Orange |
|
Engineering |
| IDI - PLC South Sewer Force Main and Gravity Main |
Riverside |
Riverside |
|
Engineering |
| P2660010: Domestic Water Treatment plant Operations at Hot Creek Hatchery |
Mammoth Lakes |
Mono |
|
Engineering |
| Merced Avenue Median Landscaping Improvement |
Coalinga |
Fresno |
|
Engineering |
| Putnam and Tomah Area Concrete and Water Improvement Project |
Porterville |
Tulare |
|
Engineering |
| McFadden Ave. (Phase I) Brookhurst St. & Bolsa Ave. (Phase II) Street Improvement Project |
Westminster |
Orange |
|
Engineering |
| Third Street and Anderson Avenue HAWK Signal |
Riverside |
Riverside |
|
Engineering |
| California Street & Redlands Boulevard Intersection Widening Project - Rebid |
Redlands |
San Bernardino |
|
Engineering |
| Irvine Center Drive Sidewalk Improvements, CIP 342401 |
Irvine |
Orange |
|
Engineering |
| HSIP Cycle 11 Corridor Safety Improvement Project |
Various |
Tulare |
|
Engineering |
| Orange Avenue Basin Fencing Project |
Selma |
Fresno |
|
Engineering |
| Alicia Parkway Regional Traffic Signal Synchronization Program Project |
Laguna Niguel |
Orange |
|
Engineering |
| Road Improvement 2023 Project |
Lindsay |
Tulare |
|
Engineering |
| City of Garden Grove Wells 22, 26, and 27 PFAS Water Treatment Plants |
Garden Grove |
Orange |
|
Engineering |
| Las Palmas Pump Station (3B-4) Upgrades |
Fullerton |
Orange |
|
Engineering |
| SDCRAA - Taxiway B Asphalt Rehabilitation |
San Diego |
San Diego |
|
Engineering |
| Daphne Stormwater Basin and Lift Station Improvements |
Lemoore |
Kings |
|
Engineering |
| FY 26-27 Pavement Resurfacing Treatment (Single and Double Fiberized Slurry) Measure H Project |
Hanford |
Kings |
|
Engineering |
| FY 26-27 Pavement Resurfacing Treatment (Manhole and Value Cover Adjustment) Measure H Project |
Hanford |
Kings |
|
Engineering |
| San Joaquin Reservoir Valve Actuator Replacement |
Newport Beach |
Orange |
|
Engineering |
| HSIP Cycle 11 Guardrail Safety Improvement |
Various |
Tulare |
|
Engineering |
| Citrus & Redlands Connectivity Project |
Perris |
Riverside |
|
Engineering |
| 2025/26 SB-1 Street Maintenance Improvements & 2025/26 Downtown Bollards Installation |
Riverside |
Riverside |
|
Engineering |
| Citywide Pavement Rehabilitation |
Laguna Hills |
Orange |
|
Engineering |
| Sanger High School Track Resurfacing at Dodson Field at Washington Academic Middle School |
Sanger |
Fresno |
|
Engineering |
| San Joaquin River Trail Rehabilitation and Sheltered Rest Area |
Firebaugh |
Fresno |
|
Engineering |