| Pre-Qualification for Prima Zone 4 Phase A Main Gas Line Project |
San Juan Capistrano |
Orange |
|
Prequalification |
| 2026-2027 Annual Gravity Sewer Lining Project |
Dana Point and Laguna Beach |
Orange |
|
Engineering |
| EV Charging Station - La Habra Community Center - Project No. 4-B-26 Fiscal Year 2026-2027 |
La Habra |
Orange |
|
RFP |
| 26-137 Landscape Cleanup and Maintenance Service |
Santa Ana |
Orange |
|
RFP |
| IFB Tree Services in Orange County |
Orange |
Orange |
|
|
| DBB Prima Zone 4 Phase A Main Gas Line Project |
San Juan Capistrano |
Orange |
|
|
| Construction of Adams Avenue Rul 20B Underground Utility District No. 22 |
Costa Mesa |
Orange |
|
Building |
| Barbadanes Park Play Area Rehabilitation |
Mission Viejo |
Orange |
|
Engineering |
| West Newport Beach Sand Replenishment Project |
Newport Beach |
Orange |
|
|
| Professional Consulting Services for the Pavement Management Program Update 2027 |
Tustin |
Orange |
|
RFP |
| Greenery Equipment Maintenance & Repair Services |
Brea |
Orange |
|
|
| Job Order Contract (JOC) for General Contracting Services |
Orange |
Orange |
|
Building |
| Request For Quotes (RFQ) Window Covering Supply and Maintenance |
Orange |
Orange |
|
RFQ |
| Rienda Zone B Recycled Water Pump Station |
Ladera Ranch |
Orange |
|
Building |
| Brea Olinda HS Access and Athletic Upgrades & Aguatic Complex Project RFQ/RFP |
Brea |
Orange |
|
RFQ |
| Marguerite Aquatics, Tennis and Recreation Center Surface Parking Lot Expansion |
Mission Viejo |
Orange |
|
Building |
| HVAC Preventative Maintenance Services at Santiago Canyon College |
Orange |
Orange |
|
|
| Electrical Systems Maintenance and Repair Services |
Orange |
Orange |
|
|
| City Yards Facilities Janitorial Services |
Huntington Beach |
Orange |
|
RFQ |
| Concrete Sealant Services |
Multiple Locations in Orange County |
Orange |
|
|
| GWRP A/C Replacement |
San Juan Capistrano |
Orange |
|
RFQ |
| Testing, Insulation and Repair of Boilers & Water Heaters |
Orange, Santa Ana, Irvine |
Orange |
|
RFP |
| Civic Center Facilities Janitorial Services |
Huntington Beach |
Orange |
|
RFQ |
| Baker Water Treatment Plant CIP Piping Replacement |
Irvine |
Orange |
|
|
| On-Call Asphalt, Concrete, and Concrete Grinding Repair Services |
Newport Beach |
Orange |
|
Engineering |
| FY 2026-27 Facilities Painting Project |
Newport Beach |
Orange |
|
Building |
| HVAC Units Upgrade-City Hall & PD |
Buena Park |
Orange |
|
RFB |
| Peralta Hills Sanitary Sewer Improvement |
Anaheim |
Orange |
|
RFP |
| Anaheim West Tower - EOC Window Improvement |
Anaheim |
Orange |
|
RFP |
| FY 26-27 CDBG Curb Ramp Improvement Project |
Laguna Hills |
Orange |
|
|
| Pedestrian Accessibility Improvement project: Phase 10 |
Laguna Woods |
Orange |
|
Building |
| RF BID - 26-27.09 Signal Installation and Fiber Optic Communication for Walnut Avenue and Orange Street. |
Orange |
Orange |
|
RFB |
| FY 2027 Local Street Improvement Program (Re-Bid) |
San Clemente |
Orange |
|
Engineering |
| FY 2027 Local Street Improvement Program (Canceled) |
San Clemente |
Orange |
|
|
| Annual Pavement Maintenance at Various Locations FY 2026-2027 Phase 1 |
Orange |
Orange |
|
RFB |
| Install Rectangular Rapid Flashing Beacons (RRFB) at 14 High-Pedestrian -Volume Uncontrolled Crosswalk Locations |
Anaheim |
Orange |
|
|
| Environmental Impact Report and Technical Studies for the Bluffs at Boca Project, 320-326 La Rambla and 312-314 Boca Del Canon, San Clemente, CA |
San Clemente |
Orange |
|
RFP |
| Rental and Maintenance of Reverse Osmosis System |
Santa Ana, Orange |
Orange |
|
|
| DESIGN BUILD FOR VERTICAL CONVEYANCE PHASES 2 - 4 PROJECT |
Santa Ana |
Orange |
|
RFP |
| Custodial Services Citywide |
Anaheim |
Orange |
|
|
| The Village at Laguna Niguel (Sub-Bids Only) |
Laguna Niguel |
Orange |
|
Commercial |
| Placentia Library District HVAC Screen Project |
Placentia |
Orange |
|
RFP |
| Progressive Design-Build Feasibility and Project Management Consulting Services for the Sewer System Capacity Upsizing Projects |
Westminster |
Orange |
|
RFP |
| ASI Wellness Initiative, Project No: FL-2673 (Titan Student Union & Student Recreation Center Renovation/Expansion) |
Fullerton |
Orange |
|
RFQ |
| Contract Administration and Construction Inspection Services (CA/CI) For: Intersection Improvements at Los Alisos/Muirlands and Bake/Toledo |
Lake Forest |
Orange |
|
RFP |
| La Paz Road 30-Inch Recycled Water Trenchless Pipeline |
Mission Viejo |
Orange |
|
Engineering |
| Bolsa Chica Road Improvement |
Westminster |
Orange |
|
Engineering |
| San Luis Rey Park Restroom Rehabilitation |
San Clemente |
Orange |
|
Building |
| Animal Shelter Tenant Improvements Project |
Laguna Beach |
Orange |
|
Building |
| Glenneyre Parking Structure Repairs & Striping |
Laguna Beach |
Orange |
|
Building |