| Re-Slurry and Re-Stripe Bldg. 88 and 98 Parking Lot |
McClellan Park |
Sacramento |
|
Site Work / Non-Building |
| Trout Creek Conifer Removal |
South Lake Tahoe |
El Dorado |
|
Site Work / Non-Building |
| Secondary Clarifier No. 1 Rehabilitation Project |
Santa Rosa |
Sonoma |
|
Site Work / Non-Building |
| City Gauche Aquatic Park (GAP) Pool Heater Replacement Project |
Yuba City |
Sutter |
|
Site Work / Non-Building |
| Corpyard Phase II - Concrete Ramp Coating |
West Sacramento |
Yolo |
|
Site Work / Non-Building |
| FY2023-24 Culvert Replacements - Lincoln Rd at Snake River |
Sutter County |
Sutter |
|
Site Work / Non-Building |
| Corpyard Phase II - Connex Structural Anchoring & Welding (Rebid) |
West Sacramento |
Yolo |
|
Site Work / Non-Building |
| Hazel Avenue at U.S. 50 Interchange Segment 1 Tree Removal Project |
Sacramento County |
Sacramento |
|
Site Work / Non-Building |
| Railroad Timber Bridge Replacements: Basalt Creek (MP 29.31) & San Antonio Slough (MP 31.74) |
Sonoma County |
Sonoma |
|
Site Work / Non-Building |
| CHPERS I: Replacement of Towers and Vaults - Leviathan Peak |
Alpine County |
Alpine |
|
Site Work / Non-Building |
| West Linda Multi-Use Basin Phase II Project |
Yuba County |
Yuba |
|
Site Work / Non-Building |
| Tahoe Tallac Park Field Renovations |
Sacramento |
Sacramento |
|
Site Work / Non-Building |
| SMF Pedestrian Walkway - Riparian Public Art Installation Project |
Sacramento |
Sacramento |
|
Site Work / Non-Building |
| Competition Pool Replaster Project |
Dixon |
Solano |
|
Site Work / Non-Building |
| South County Roadside Fuels Reduction Project |
Butte County |
Butte |
|
Site Work / Non-Building |
| Humboldt Pacific Crest Trail Bridge Replacement |
Humboldt County |
Humboldt |
|
Site Work / Non-Building |
| FTB - Electric Vehicle Supply Equipment - Franchise Tax Board |
Sacramento |
Sacramento |
|
Site Work / Non-Building |
| Rowe Ave Reservoir Rehabilitation Project |
Yuba City |
Sutter |
|
Site Work / Non-Building |
| Parking Lot Repairs, Removal and Replacement of Asphalt, and Striping Services at the Carmichael DMV Field Office |
Carmichael |
Sacramento |
|
Site Work / Non-Building |
| USACE SPK DBB Construction - LAR C3B South - Sacramento |
Sacramento |
Sacramento |
|
Site Work / Non-Building |
| USACE SPK DBB Construction - LAR C3B North - Sacramento |
Sacramento |
Sacramento |
|
Site Work / Non-Building |
| Butte Slough Outfall Gates Repairs |
Colusa / Sutter Counties |
Colusa,Sutter |
|
Site Work / Non-Building |
| 2027 CIPP Lining Project |
Napa |
Napa |
|
Site Work / Non-Building |
| Construction of the Ives Park ADA Path, Segment 2 |
Sebastopol |
Sonoma |
|
Site Work / Non-Building |
| Phase V Communication Facilities Replacement Group A: 1512A Pratt Mtn, 1512B Bunchgrass Mtn, 1512E Mt. Pierce |
Humboldt / Shasta Counties |
Humboldt,Shasta |
|
Site Work / Non-Building |
| Lost Creek Crossing Upgrade 2026 Construction |
Mill Creek |
Tehama |
|
Site Work / Non-Building |