| D-4034 PUMA Center Relocation - Diablo Valley College (Prequalification) |
Pleasant Hill |
Contra Costa |
|
School |
| SKY Boiler Plant - Electrical Metering Services |
San Bruno |
San Mateo |
|
School |
| Jack Baskin Engineering Building - 2nd Floor Labs Renovation Rooms 230, 258 & 258A |
Santa Cruz |
Santa Cruz |
|
School |
| Liberty Union High School District's Gateway Program Portable, Shade Structures and Landscape Improvements Project at Independence High School Campus |
Brentwood |
Contra Costa |
|
School |
| Highland Elementary School Campus Improvements |
Richmond |
Contra Costa |
|
School |
| UC Botanical Garden Access Improvements - Phase 2 (Fountain Plaza) - UC Berkeley |
Berkeley |
Alameda |
|
School |
| Ethel Moore Building Demolition |
Oakland |
Alameda |
|
School |
| FS Zellerbach Hall Mezzanine Flooring Replacement (Rebid) - UC Berkeley |
Berkeley |
Alameda |
|
School |
| BCEC - EHCP - Doors Frames and Hardware - Work Package 23 - UC Berkeley |
Berkeley |
Alameda |
|
School |
| BCEC - EHCP - Casework, Millwork, Interior Specialties, Window Shades & Appliance - Work Package 29 - UC Berkeley |
Berkeley |
Alameda |
|
School |
| Fire Suppression System Replacement at North Monterey County High School - CANCELLED |
Castroville |
Monterey |
|
School |
| Lease-Leaseback Construction Services for Science & Technology Classroom and CACE Classroom Extension at Del Mar High School |
San Jose |
Santa Clara |
|
School |
| Acoustical Wall Panels Installation at Room 109 & 120 at Francis Scott Key Elementary School |
San Francisco |
San Francisco |
|
School |
| RFQ Environmental Consulting Services for California Memorial Stadium Capacity Events - UC Berkeley |
Berkeley |
Alameda |
|
School |
| Paly VAPA & Facilities Portable Move/Assembly |
Palo Alto |
Santa Clara |
|
School |
| Student Housing Buildings 5 & 7 Roof Replacement |
Cupertino |
Santa Clara |
|
School |
| SUHSD Sequoia HS New Classroom Building (Sub-Bids Only) |
Redwood City |
San Mateo |
|
School |
| Building 3900 Roof Replacement Project at Chabot College |
Hayward |
Alameda |
|
School |
| Pacific Grove Adult School Building F Demolition and Utility Relocation |
Pacific Grove |
Monterey |
|
School |
| RFQ for Task Order-Construction Agreement for Multiple Projects - Master Enabling Agreement - SJSU |
San Jose |
Santa Clara |
|
School |
| RFP for Pre-Construction and Lease-Leaseback Services for Camino Pablo and Los Perales Elementary School Modernization Projects |
Moraga |
Contra Costa |
|
School |
| Measure G Construction Projects Announcement of Pre-Qualification Procedures and Open Dates for Annual Pre-Qualification |
Novato |
Marin |
|
School |
| Sequoia High School LED Upgrade |
Redwood City |
San Mateo |
|
School |
| RFP for Design-Build Services - Millard and Leitch Elementary School New Construction Project |
Fremont |
Alameda |
|
School |
| Canada College Sports Fields Replacement - Site Work |
Redwood City |
San Mateo |
|
School |
| Multi-Site Playground Upgrade Projects |
Dublin |
Alameda |
|
School |
| Horace Mann HVAC Replacement |
San Jose |
Santa Clara |
|
School |
| (Advertisement Only) UC Berkeley - Electrified Heating & Cooling Plant Project WP-20 Landscaping (Sub-Bids Only) |
Berkeley |
Alameda |
|
School |
| RFQ/P for Lease-Leaseback Construction Services for the Modernizations at Stocklmeir, Garden Gate and Eisenhower Project |
Sunnyvale, Cupertino & Santa Clara |
Santa Clara |
|
School |
| Multisite 2-Story Classroom HVAC Equipment Replacement |
Palo Alto |
Santa Clara |
|
School |
| Lease-Leaseback Construction Services for Cupertino High School New Art Building Project |
Cupertino |
Santa Clara |
|
School |
| Lease-Leaseback Construction Services for Fremont High School New Art, Design, and Engineering Building Project |
Sunnyvale |
Santa Clara |
|
School |
| Fire Suppression System Replacement at North Monterey County High School |
Castroville |
Monterey |
|
School |
| NAF DHW Heat Exchanger Replacement - UC Berkeley |
Berkeley |
Alameda |
|
School |
| RFP for Lease-Leaseback Preliminary Construction Services for Los Cerritos Elementary School Modernization, Baden Campus Utility and Modular Buildings, and Temporary Campus at Baden Projects |
South San Francisco |
San Mateo |
|
School |
| RFQ/P for Lease-Leaseback Construction Services for San Andreas HS + Carlisle Building Roof Replacement and HVAC Installation Project |
Larkspur |
Marin |
|
School |
| RFQ/P for Lease-Leaseback Construction Services for the Lynbrook High School Building 70 Roofing, HVAC, and Fire Alarm Replacement |
San Jose |
Santa Clara |
|
School |
| Marina High School Relocatables Site Work - BID #2 |
Marina |
Monterey |
|
School |
| Argonne Early Education School Play Yard Improvement |
San Francisco |
San Francisco |
|
School |
| Monterey Peninsula College - ADPE HVAC Modifications and Controls |
Monterey |
Monterey |
|
School |
| RFQ Pool of Material Testing and Inspection Services - Fremont Unified School District |
Fremont |
Alameda |
|
School |
| RFQ Pool of Commissioning Consultant Services - Fremont Unified School District |
Fremont |
Alameda |
|
School |
| RFQ/P - Construction Management Services for Half Moon Bay High School Measure K Priority Projects |
Half Moon Bay |
San Mateo |
|
School |
| District Office Restroom Remodel |
Dublin |
Alameda |
|
School |
| RFQ/P Lease-Leaseback Construction Services - Early Childhood Education Center |
Pleasanton |
Alameda |
|
School |
| District-Wide Food Service Upgrades Project - Walnut Grove ES |
Pleasanton |
Alameda |
|
School |
| District-Wide Food Service Upgrades Project - Donlon ES |
Pleasanton |
Alameda |
|
School |
| Brookvale ES Modernization - MPR HVAC Replacement |
Fremont |
Alameda |
|
School |
| Azevada Elementary School Lunch Shelter - ADA Upgrades |
Fremont |
Alameda |
|
School |
| Soquel High School Performing Arts Center Lease-Leaseback Contract |
Soquel |
Santa Cruz |
|
School |