| Parlier HSIPSL-5252(037) Guardrail Improvement |
Parlier |
Fresno |
|
Engineering |
| California Avenue Sidewalks-9th to Approximately 280' to the East |
Kerman |
Fresno |
|
Engineering |
| City of Colton PFAS Treatment Systems Design for Existing Well Sites |
Colton |
San Bernardino |
|
Engineering |
| Lot #44 and Transit Operations Pavement Rehabilitation |
Visalia |
Tulare |
|
Engineering |
| Fire Station 54 Parking Lot Rehab |
Visalia |
Tulare |
|
Engineering |
| Cabot Park Rehabilitation |
Laguna Hills |
Orange |
|
Engineering |
| El Conejo Park Rehabilitation |
Laguna Hills |
Orange |
|
Engineering |
| MacKenzie Park Rehabilitation |
Laguna Hills |
Orange |
|
Engineering |
| San Remo Park Rehabilitation |
Laguna Hills |
Orange |
|
Engineering |
| Veeh Ranch Park Rehabilitation |
Laguna Hills |
Orange |
|
Engineering |
| Moulton Parkway and Mandeville Drive Acceleration Lane Median Modification |
Laguna Hills |
Orange |
|
Engineering |
| Canyon Lake Water Treatment Plant Improvements Fixed Price Design-Build Project Delivery |
Lake Elsinore |
Riverside |
|
Engineering |
| Biofilter Media Replacement and Associated Equipment Inspection at Visalia Water Reclamation Facility |
Visalia |
Tulare |
|
Engineering |
| Victoria Sidewalk Widening |
San Clemente |
Orange |
|
Engineering |
| Riverside Reginal Water Quality Control Plant (RRWQP) Biosolids Centrifuge 2 Installation |
Riverside |
Riverside |
|
Engineering |
| Storm Drain Improvements at East Avenida Cordoba & Via Avila |
San Clemente |
Orange |
|
Engineering |
| Z2DA-570-20-308 Replace and Expand Chilled Water Infrastructure in Building 1-Construction Service Procurement |
Fresno |
Fresno |
|
Engineering |
| Brine Pipeline Access Improvements (Presolicitation) |
Riverside |
Riverside |
|
Engineering |